Energy project modelling in Western Australia’s Wholesale Electricity Market (WEM)

Western Australia’s Wholesale Electricity Market (WEM) supplies the South West Interconnected System (SWIS), which serves about 1.2 million homes and businesses. Unlike the NEM, it pays for capacity as well as energy, through the Reserve Capacity Mechanism. Gridcog models how batteries, solar and flexible loads earn from energy, capacity and essential system services in the WEM.

  • Rooftop solar is the largest generator in the SWIS, on about 40% of households, and supplied a record 76% of demand on 25 September 2023.

  • The SWIS set a peak demand record of 4,486 MW on 20 January 2025 and a minimum demand record of 383 MW on 16 November 2025.

  • WEM users pay for capacity through the Individual Reserve Capacity Requirement, based on their median demand in 12 peak trading intervals.

  • In Fabian Le Gay Brereton’s WEM model, adding a 4 MW / 4-hour battery to rooftop solar cut a commercial site’s indicative supply costs by almost 70%, against 7.7% to 15.8% for solar alone across four load shapes.

All prices on this page are in Australian dollars.

How the WEM works

How does the Wholesale Electricity Market work?

The WEM is a gross pool market with both energy and capacity mechanisms: participants are paid for producing energy and for making capacity available to meet peak demand. That is the key difference from Australia’s National Electricity Market (NEM), which is energy-only. AEMO operates the WEM, and Western Power owns and operates the network.

The reformed WEM began on 1 October 2023. AEMO now dispatches energy and essential system services together through security-constrained economic dispatch, in five-minute intervals. The market rules have since been renamed the Electricity System and Market (ESM) Rules.

What are the parts of the WEM?

MechanismWhat it doesTimeframe
01Real-Time Market
The operational market: AEMO dispatches energy and essential system services through security-constrained economic dispatch, with prices reflecting the marginal cost of supply in each dispatch intervalReal time, five-minute intervals
02Short Term Energy Market (STEM)
A day-ahead market where participants adjust their contracted energy position; it affects settlement but doesn’t dispatch the power systemDay ahead
03Reserve Capacity Mechanism (RCM)
Pays for capacity (MW) to be available during system stress, through Capacity Credits assigned by AEMOAbout two years ahead
04Frequency Co-optimised Essential System Services (FCESS)
Five services co-optimised with energy: Regulation Raise and Lower, Contingency Reserve Raise and Lower, and Rate of Change of Frequency (RoCoF) ControlReal time
05Individual Reserve Capacity Requirement (IRCR)
Allocates the cost of reserve capacity to users based on their median demand in 12 peak trading intervalsSet from each capacity year’s peaks

The SWIS

What makes the South West Interconnected System different?

It is a large, isolated grid with one of the world’s highest shares of rooftop solar. The SWIS isn’t connected to the NEM. It serves about 1.2 million homes and businesses, who use about 17.9 TWh a year, and rooftop solar on about 40% of households is now its largest generator. The supply mix is changing fast, with the state government committed to retiring its state-owned coal power stations by 2030.

The network is long and thin, so the system is leading the world in moving away from traditional power distribution and adopting stand-alone power systems and microgrids.

What generates the SWIS’s electricity?

Share of SWIS generation, 1 July 2024 to 30 June 2025

  • 31.7%

    Gas

  • 27.7%

    Coal

  • 19.5%

    Rooftop solar

  • 16.8%

    Wind

  • 1.5%

    Grid-scale solar

  • 1.34%

    Battery

  • 0.38%

    Hybrid

  • 0.34%

    Biomass gas

When does demand peak in the SWIS?

On summer late afternoons and early evenings, when solar output falls and air-conditioning load rises. Prices are low in the middle of the day and high as solar ramps down, so new solar does little to reduce a site’s contribution to system peak demand. The SWIS set its peak demand record of 4,486 MW on 20 January 2025, and its minimum demand record of 383 MW on 16 November 2025.

Revenue streams

How do energy projects earn money in the WEM?

From capacity, energy and essential system services, and from cutting network and capacity costs. Projects can earn Capacity Credits in the Reserve Capacity Mechanism, provide FCESS, trade energy in the Real-Time Market or STEM, respond to Western Power’s Network Opportunities Map and reduce network and IRCR costs. Batteries can stack the RCM, energy arbitrage and FCESS.

  • Wholesale
  • Balancing and frequency
  • Capacity and contracts
  • Behind the meter

Capacity and contracts

Reserve Capacity Mechanism

AEMO certifies capacity and assigns Capacity Credits about two years ahead; providers are paid for holding capacity and penalised if it isn’t available when needed

Who it suits

Batteries, generators and demand-side participation

Behind the meter

Avoided IRCR

Cut demand during the 12 peak trading intervals that set each user’s share of capacity costs

Who it suits

Large energy users with batteries, generators or flexible loads

Balancing and frequency

FCESS

Regulation, contingency reserve and RoCoF services, dispatched with energy in the Real-Time Market

Who it suits

Accredited batteries, generators and demand-side resources

Wholesale

Energy

Sell or buy in the Real-Time Market, adjust positions in the STEM, or reduce supply costs through retail arrangements

Who it suits

Generators, batteries and spot-exposed users

Behind the meter

Network

Respond to Western Power’s Network Opportunities Map and reduce network tariff charges

Who it suits

Behind-the-meter batteries and flexible loads

Capacity and contracts

Government tenders

Capacity Investment Scheme tenders for the WEM, opened in August 2025 for 1.6 GW of renewable generation and 2.4 GWh of clean dispatchable capacity

Who it suits

New renewable and storage projects

01 / 06

How does the IRCR affect a site’s electricity costs?

It makes a site’s demand at system peak one of its biggest costs. The IRCR recovers the cost of procuring capacity through the Reserve Capacity Mechanism by allocating it to users on their median demand in 12 peak trading intervals. Loads can also earn capacity payments through demand-side participation. A battery, generator or flexible load that cuts demand in those intervals cuts the charge.

Modelled in Gridcog

How much do solar and batteries cut supply costs in the WEM?

Solar a little, solar with a battery a lot. Gridcog CEO Fabian Le Gay Brereton modelled four sites in the WEM with the same annual volume of 55.8 GWh but different load shapes, adding 11.7 MWdc of rooftop solar and then a 4 MW / 4-hour (16 MWh) battery optimised against wholesale prices. Costs included wholesale energy, IRCR, environmental charges and market fees.

Existing rooftop solar has cannibalised the case for new solar in the SWIS. For two of the sites, exported solar had negative value to the retailer because it often coincided with negative prices.

Fabian Le Gay BreretonCEO and Co-Founder

ScenarioEffect on the retailer’s indicative cost to serve
01Baseline
An almost $4.5 million gap between the cheapest load shape (commercial) and the most expensive (residential portfolio), for the same annual volume
02Add 11.7 MWdc rooftop solar
Costs fell by 7.7% (residential portfolio) to 15.8% (manufacturing), because solar barely changes demand at the summer evening peak and exports when prices are lowest
03Add solar and a 4 MW / 4-hour battery
Costs fell by about 40% (residential portfolio) to almost 70% (commercial); the commercial site’s peak rate fell from about 25c/kWh to under 10c/kWh

Sizing solar and storage for a site in Western Australia?

Model your project in Gridcog

How Gridcog models the WEM

How does Gridcog model the Wholesale Electricity Market?

With WEM prices, capacity rules and network tariffs in one model. Gridcog co-optimises a battery’s dispatch across energy, capacity and essential system services, and models every stakeholder’s costs, including the retailer’s exposure to wholesale prices and system costs.

Historical WEM real-time prices in the Gridcog Library, plus your own forward curves or premium price scenarios.

Historical and forecast RCM prices and de-rating factors, so a battery or generator earns capacity revenue alongside energy.

Model a site’s contribution to the 12 peak trading intervals and optimise batteries, gensets and flexible loads to reduce it.

Add FCESS as a revenue stream for assets that can provide it. Historical FCESS prices are available from Gridcog’s Industry team.

Western Power’s network tariffs for the current regulatory year, kept up to date in the Gridcog Library.

Model shared solar, batteries and tariffs across an embedded network or a stand-alone microgrid, with costs and benefits for each party.

Customers

Which Western Australian teams use Gridcog?

All case studies
  • EnergyTec

    Embedded network provider, Western Australia

    Models solar and battery projects for airports, university campuses, retail, mixed-use residential and retirement villages, and has used Gridcog on two of the biggest property portfolios in WA.

    ‘Gridcog demonstrated a stronger understanding of the WA wholesale energy market than the alternatives.’
    Rob Rye, Technical Services Operations Manager
  • AMPERES

    Community-owned energy for First Nations communities, Western Australia

    Uses Gridcog to model financial and operational scenarios for community-owned renewable projects, including in Djarindjin on the Dampier Peninsula.

    ‘Gridcog’s ability to model different financial and operational scenarios means we can adjust as needed and keep the communities at the centre of the decision-making process.’
    Jared Stone, Community Microgrids Program Manager, Amboranj Power

Frequently asked questions

No. The WEM supplies the South West Interconnected System around Perth and the south-west of Western Australia, which isn’t connected to the NEM in the eastern states. The two markets have different designs: the WEM pays for capacity through the Reserve Capacity Mechanism, while the NEM is energy-only. See Australia’s National Electricity Market.

The South West Interconnected System, Western Australia’s main grid. It serves about 1.2 million homes and businesses across Perth and the south-west, with about 7,650 km of transmission lines and 97,000 km of distribution lines, owned and operated by Western Power. About 17.9 TWh of electricity is traded and used through it each year.

The WEM’s capacity market. AEMO forecasts peak demand and reliability needs, sets a Reserve Capacity Requirement and certifies capacity providers about two years ahead. Providers receive Capacity Credits and are paid for holding capacity, with penalties if it isn’t available when needed. Users pay for it through the Individual Reserve Capacity Requirement.

The charge that allocates the cost of reserve capacity to electricity users. Each user’s share is based on its median demand during 12 peak trading intervals. Because the SWIS peaks on summer late afternoons and evenings, rooftop solar does little to reduce it, but a battery, generator or flexible load that cuts demand in those intervals can.

Frequency Co-optimised Essential System Services, the WEM’s market-based services for keeping the system secure. There are five: Regulation Raise, Regulation Lower, Contingency Reserve Raise, Contingency Reserve Lower and Rate of Change of Frequency (RoCoF) Control. AEMO dispatches them together with energy in the Real-Time Market, and batteries, generators and demand-side resources can be accredited to provide them.

Yes. The federal Capacity Investment Scheme runs tenders for the WEM as well as the NEM. In August 2025, two WEM tenders opened for 1.6 GW of renewable generation and 2.4 GWh of clean dispatchable capacity, with bids closing on 7 November 2025. See what replaces the Capacity Investment Scheme on our NEM page.

Request a live demo

Model your WEM project in Gridcog

Request a demo and we’ll show you how Gridcog models your project against WEM prices, the Reserve Capacity Mechanism and Western Power’s tariffs.

The team behind Gridcog

Fabian Le Gay Brereton, Chief Executive Officer and Co-Founder of Gridcog

Fabian Le Gay Brereton

Chief Executive Officer & Co-Founder

Previously co-founded Greensense, acquired by ERM Power (now Shell Energy).

Pete Tickler, Chief Product Officer and Co-Founder of Gridcog

Pete Tickler

Chief Product Officer & Co-Founder

Co-founded Greensense and led digital innovation at ERM Power (now Shell Energy).

Genna Boyle, Chief Commercial Officer and Head of EMEA at Gridcog

Genna Boyle

Chief Commercial Officer & Head of EMEA

More than 10 years in energy strategy, trading and renewables, with senior roles at Battery Optimiser and Limejump.