Spain shares the Iberian wholesale electricity market with Portugal. OMIE runs the day-ahead and intraday markets, and Red Eléctrica runs balancing services and grid operation. Gridcog models how solar, wind and batteries earn across these markets, interval by interval and within their grid connection limits, so you can test a hybrid project before you invest.
Spain recorded about 400 hours of negative prices in the first quarter of 2026, against about 48 hours a year earlier.
Solar capture rates in Spain fell from around 90% in spring 2022 to 40% in spring 2026.
About 83% of Spain’s distribution grid nodes are saturated, and about 67 GW of access was requested for new demand in 2024.
Spain’s first capacity market, approved by the European Commission in May 2026 with a budget of up to €9 billion over 10 years, came into force on 18 September 2026.
How the market works
How does the Spanish electricity market work?
Spain and Portugal share the Iberian wholesale market, with a price zone each. OMIE runs the day-ahead and intraday markets, Red Eléctrica de España (REE), the transmission system operator, runs balancing services and resolves technical constraints, the CNMC regulates the market and networks, and the Ministry for the Ecological Transition (MITECO) sets energy policy, including the national energy and climate plan (PNIEC).
Spain has a lot of inherent flexibility from pumped hydro and combined cycle gas turbines (CCGTs), and around 50 GW of solar, but it has been slower than its European neighbours to add battery storage. Regulatory barriers to batteries are now starting to lift, and new markets, such as the capacity market, are coming in.
Which markets can you trade power in in Spain?
| Market | Run by | How it works |
|---|---|---|
01Day-ahead market | OMIE | Coupled with the rest of Europe through Single Day-Ahead Coupling, in 15-minute products since 1 October 2025 |
02Intraday auctions | OMIE | Part of the pan-European intraday auctions since 13 June 2024 |
03Intraday continuous | OMIE | Continuous cross-border trading up to shortly before delivery |
04Frequency containment reserve (FCR) | REE | Mandatory for eligible generators and not paid |
05Automatic frequency restoration reserve (aFRR) | REE | Secondary regulation, procured in quarter-hourly blocks |
06Manual frequency restoration reserve (mFRR) | REE | Tertiary regulation |
07Technical constraints | REE | Redispatch where the network can’t carry scheduled flows |
08Capacity market | REE, supervised by the CNMC | Pay-as-bid auctions for firm capacity, in force since 18 September 2026 |
How does Spain’s market compare with GB?
| Feature | Spain | Great Britain |
|---|---|---|
| Market area | Iberian market with Portugal, coupled with the rest of Europe | National market, not coupled with the EU since 2021 |
| Day-ahead products | 15-minute | Hourly and half-hourly |
| Balancing | REE’s aFRR, mFRR and technical constraints | NESO’s Balancing Mechanism and Dynamic Containment, Moderation and Regulation |
| Capacity market | New: in force since September 2026, no auction yet | Since 2014, with T-4 and T-1 auctions |
| Solar | Around 50 GW; capture rates down to 40% in spring 2026 | Load factor of about 11% to 12% |
Thinking Energy
Spanish energy market videos
Short explainers from the Gridcog team on Spain and its neighbours, and how to model projects there.
Modelling utility-scale BESS across Europe
May 2026 · 3:36
Modelling co-located front-of-meter solar and BESS in Spain
November 2025 · 3:26
Understanding the Spanish energy market
October 2025 · 3:28
Negative prices
Why are solar prices falling in Spain?
Because solar is concentrating generation in the same daylight hours. As more solar connects, prices fall in the middle of the day: Spain recorded about 400 hours of negative prices in the first quarter of 2026, against about 48 hours a year earlier. The average captured solar price fell from about €42/MWh in 2024 to under €30/MWh in the first half of 2026, and solar capture rates fell from around 90% in spring 2022 to 40% in spring 2026.
Little new storage has been added over that time, which strengthens the case for co-locating storage with solar.
Targets and grid access
What are Spain’s 2030 renewable targets?
81% renewable electricity by 2030. The updated national energy and climate plan (Plan Nacional Integrado de Energía y Clima, PNIEC) targets 76 GW of solar, 62 GW of wind, including 3 GW offshore, and 22.5 GW of storage, including pumped hydro and solar thermal storage.
How hard is it to get a grid connection in Spain?
Very hard in much of the country. About 83% of distribution grid nodes were already saturated in 2025, and about 67 GW of access was requested for new demand in 2024 alone, almost half of which was rejected. Flexible connection agreements, common in Germany, are starting to appear in Spain.
‘The network is saturated, and we don’t have flexible demand in many areas. Standalone batteries are difficult to monetise because we can’t always draw or inject energy when we need to.’
Hybridisation
Why does hybridisation matter in Spain?
Because it protects a renewable project against falling capture prices and uses a connection that is hard to get. Hybridisation is becoming more and more important for developers and IPPs in Spain. Adding a battery to a solar or wind plant lets a project move energy out of the cheapest hours and earn in both the wholesale market and balancing services.
Modelling a hybrid project is harder, because you have to account for how the assets interact, the contracts and the grid limits together. A standalone renewable asset faces a harder business case, one far more exposed to market fundamentals than a project protected by a co-located flexible asset.
Revenue streams
How do batteries earn money in Spain?
From wholesale arbitrage and balancing services today, with capacity payments to come. Batteries can trade spreads in the day-ahead and intraday markets, provide aFRR and mFRR to Red Eléctrica and, once auctions start, earn from the capacity market. Behind the meter, they can also cut network access charges.
- Wholesale
- Balancing and frequency
- Capacity and contracts
- Behind the meter
Wholesale
Wholesale arbitrage
Charge in the cheapest, often negative-priced, solar hours and discharge into the evening peak, across day-ahead and intraday markets
Who it suits
Standalone and co-located batteries
Balancing and frequency
aFRR (secondary regulation)
Capacity and energy for automatic frequency restoration, procured by REE in quarter-hourly blocks
Who it suits
Front-of-meter batteries and flexible plant
Balancing and frequency
mFRR (tertiary regulation)
Manually activated reserve procured by REE
Who it suits
Front-of-meter batteries and flexible plant
Capacity and contracts
Capacity market
Pay-as-bid auctions for firm capacity in €/MW/year, with storage eligible and terms of up to 15 years for new investment
Who it suits
New and existing batteries, generation and demand response
Capacity and contracts
Offtake contracts
PPAs alongside merchant sales, and for batteries tolls, floors and swaps
Who it suits
Hybrid and standalone projects seeking bankable revenue
Behind the meter
Network charge savings
Cut the contracted power and energy terms of access tariffs such as 3.0TD and 6.1TD
Who it suits
Behind-the-meter batteries at commercial and industrial sites
How will Spain’s capacity market work?
As a centralised market for firm capacity, run by Red Eléctrica and supervised by the CNMC. The European Commission approved it in May 2026, with a budget of up to €9 billion over 10 years, and Ministerial Order TED/966/2026 brought it into force on 18 September 2026. As of 30 September 2026, no auction had yet been held.
| Feature | Design |
|---|---|
| Product | Firm capacity in MW, offered in €/MW/year, in blocks of at least 1 MW |
| Auction format | Sealed-bid, pay-as-bid |
| Main auctions | Delivery within five years of award (up to nine for qualifying new investment); 12-month terms for existing generation and storage, up to 15 years for new investment, one to 10 years for demand |
| Adjustment and transitional auctions | Annual, with 12-month delivery |
| De-rating | Firmness coefficients between 0 and 1 applied to installed capacity |
| Eligibility | Producers, storage owners, consumers and aggregators; new investment limited to renewables, storage and demand-side resources; existing generation must emit no more than 550 g CO₂/kWh |
Data centres and the blackout
What are Spain’s new rules for data centres?
Spain plans to require large data centres to cover at least 80% of their consumption with new renewable generation, matched hour by hour, before they can connect. The draft Royal Decree went to public consultation in August 2026. A revised draft, sent to the Council of State on 26 October 2026, raised the threshold from 1 MW to 10 MW, allowed battery storage to count towards hourly matching, and let operators accept disconnection without compensation in return for a five-year phase-in.
What did the April 2025 Iberian blackout show?
That Spain needs more flexibility. On 28 April 2025, Spain and Portugal suffered a total blackout after multiple trips at 12:33 caused frequency to fall and the peninsula disconnected from the rest of Europe. Complex voltage stability issues caused it, not a lack of batteries alone, but it was a wake-up call: the market has since moved to remove barriers to flexibility and add price signals such as the capacity market.
Modelled in Gridcog
How do you model a hybrid solar and battery project in Spain?
In Gridcog, step by step, against the same prices and connection limits the project will face.
- 01
Model the solar plant, including single-axis trackers, with a PPA for part of the output and merchant sales for the rest.
- 02
Set the site’s import and export limits.
- 03
Add a battery behind the same connection.
- 04
Compare the hybrid against solar alone, or let Gridcog’s autosizing find the battery, solar or wind sizes with the highest cashflow.
- 05
Review energy flows and cashflows, IRR and payback, and how the battery operated in every interval.
Testing a hybrid project in Spain?
Model your project in Gridcog→How Gridcog models Spain
How does Gridcog model the Spanish electricity market?
With Spanish prices, balancing services and tariffs, interval by interval. Gridcog co-optimises a battery across wholesale and balancing markets within the site’s connection limits, and shows how each contract and stakeholder’s cashflows change.
Wholesale prices
Day-ahead prices for Spain in the Gridcog Library, plus your own forward curves and price scenarios.
Balancing services
aFRR in quarter-hourly trading blocks and mFRR, with offers accepted and energy utilisation, so balancing revenue reflects how often a battery actually wins and is activated.
Capacity market
Auction rounds, prices and asset-level firmness (de-rating) factors, ready for the first Spanish auctions.
Network tariffs
Spanish access tariffs (peajes and cargos), including 3.0TD and 6.1TD, so behind-the-meter projects show their full bill savings.
Hybrids, sizing and contracts
Solar with trackers, wind and batteries on one connection, autosizing, PPAs and merchant sales, with IRR, payback and every interval’s dispatch.
Customers
Which Iberian teams use Gridcog?
Prosolia Energy
‘It allows us to explore multiple scenarios and make decisions based on solid, bankable data rather than assumptions.’
Marc Kleindienst, Energy Solutions Engineer
Independent power producer, Spain, Portugal, France, Italy, Germany and Mexico
Has applied Gridcog to more than 200 projects, including hybrid systems for large industrial clients in Spain, and models at least ten times faster than with in-house tools.
Experts
Who are Gridcog’s Spanish market experts?
Gridcog opened its Madrid office in 2026, with a team focused on the Iberian market.

Carlos Cortiñas
Senior Energy Associate, Madrid
Focused on the Iberian market. Before Gridcog, he spent two and a half years in structured finance at Grenergy, closing financing for solar, standalone battery and hybrid projects.
- SM
Sam MacIntyre
Product Manager, Madrid
Previously the lead Iberian long-term fundamental modeller in bp’s Power Market Insights team, after McKinsey Energy Solutions.

Laura Hoffmann-Ostenhof
Central Europe Industry Lead
Author of Gridcog’s guide to Europe’s capacity markets for battery storage.

Genna Boyle
CCO and Head of EMEA
Began her career in energy trading at Contact Energy in New Zealand, then helped set up the trading team at Limejump and went on to lead its commercial team.
Who models Spanish projects in Gridcog?
Developers and IPPs, investors and funds, energy majors, large energy users and data centres, and consultants.
Frequently asked questions
Several bodies share the job. OMIE operates the day-ahead and intraday markets for Spain and Portugal. Red Eléctrica de España is the transmission system operator: it balances the system, buys balancing services and will run the capacity market. The CNMC regulates the market and networks, and MITECO, the energy ministry, sets policy and the national energy and climate plan.
Yes, since 18 September 2026. Ministerial Order TED/966/2026 created a centralised capacity market, approved by the European Commission in May 2026 with a budget of up to €9 billion over 10 years. Storage, renewables and demand response can take part, with terms of up to 15 years for new investment. No auction had been held as of 30 September 2026.
More every year. Spain recorded about 400 hours of negative prices in the first quarter of 2026 alone, against 48 hours in the first quarter of 2025, and 555 hours across the whole of 2025. Negative prices cluster in the middle of sunny days, when solar output is highest.
The updated national energy and climate plan (PNIEC), approved in September 2024, targets 81% renewable electricity by 2030. That includes 76 GW of solar, 62 GW of wind, of which 3 GW is offshore, and 22.5 GW of storage, including pumped hydro and solar thermal storage. Battery storage is the part furthest behind, with most projects still in the pipeline.
Hybridisation (hibridación) means adding another technology, most often a battery, to an existing or planned renewable plant so that both share the same grid connection. In Spain it lets a solar or wind project move energy out of the cheapest hours, earn from balancing services and make fuller use of an access point that is hard to obtain.
Complex voltage stability issues. On 28 April 2025, multiple trips at 12:33 caused frequency to fall, Spain and Portugal disconnected from the rest of Europe seconds later, and both countries lost power. A lack of batteries didn’t cause it on its own, but the event was a wake-up call about Spain’s need for flexibility.
Under a draft Royal Decree, data centres above 10 MW would need to cover at least 80% of their consumption with new renewable generation, matched hour by hour, with battery storage counting towards the hourly match. A revised draft went to the Council of State on 26 October 2026; the decree had not been approved at the time of writing.
Yes. Gridcog models Spanish day-ahead prices, aFRR and mFRR, the capacity market and access tariffs, alongside hybrid solar, wind and battery projects on one connection. Prosolia Energy has applied it to more than 200 projects across Spain, Portugal and beyond, and Gridcog’s Madrid team supports customers in Spain and Portugal.
Request a live demo
Model your Spanish project in Gridcog
Request a demo and we’ll show you how Gridcog models your hybrid project against Spanish prices, balancing services and grid connection limits.
The team behind Gridcog

Fabian Le Gay Brereton
Chief Executive Officer & Co-Founder
Previously co-founded Greensense, acquired by ERM Power (now Shell Energy).

Pete Tickler
Chief Product Officer & Co-Founder
Co-founded Greensense and led digital innovation at ERM Power (now Shell Energy).

Genna Boyle
Chief Commercial Officer & Head of EMEA
More than 10 years in energy strategy, trading and renewables, with senior roles at Battery Optimiser and Limejump.
Which other markets does Gridcog model?
Gridcog supports 40+ markets, including Great Britain, Ireland, Australia’s NEM and WEM, New Zealand and, in Europe, Germany, Portugal, Poland, Italy, the Netherlands, Belgium and France.


.png)