Energy project modelling in Australia’s National Electricity Market (NEM)

Australia’s National Electricity Market (NEM) covers Queensland, New South Wales, Victoria, South Australia and Tasmania. It is an energy-only gross pool spot market with five-minute settlement, plus frequency control ancillary services (FCAS) and Wholesale Demand Response. Gridcog models how batteries, solar, wind and flexible loads earn in it, interval by interval, before you invest.

  • Grid-scale battery capacity in the NEM passed 9 GW in the second quarter of 2026, more than double a year earlier, and renewables supplied a record 42.1% of generation.

  • Two-hour price spreads in the mainland NEM fell by over 70% year on year in autumn 2026, and batteries earned over 60% less than in autumn 2025.

  • South Australian solar farms lost 42% of their available generation to curtailment over the past year, and total curtailment in New South Wales has risen sixfold since 2020.

  • A simplistic forecast overstated FCAS revenue 9.5 times for a utility-scale battery in Queensland, and 12.3 times for a behind-the-meter one, against a realistic Gridcog model.

All prices on this page are in Australian dollars.

How the NEM works

How does the National Electricity Market work?

The NEM is both the market and the grid that covers the eastern states of Australia. Its five regions are interconnected, so power can be traded across them, and the Australian Energy Market Operator (AEMO) runs both the market and the system. It is a gross pool, energy-only market with five-minute dispatch and settlement.

Every generator sells into the pool. Generators submit offers to AEMO, which dispatches them in a merit order shaped by price and system constraints, and the marginal offer sets the spot price in each region for each five-minute interval. Each region has a single price, set at its Regional Reference Node and adjusted by Marginal Loss Factors. Settlement moved from 30 minutes to five minutes in October 2021. Buyers and sellers can still trade ahead of dispatch, mostly through financially settled futures and contracts rather than auctions.

What does an energy-only market mean?

That investment signals come mainly from wholesale prices, not from a separate capacity market. The NEM is one of a small handful of energy-only markets, alongside ERCOT in Texas, Alberta, New Zealand and Singapore. The design leads to higher volatility and more extreme price spikes, and the wholesale price is the main signal for whether new generation, load and storage can pay their way.

How does the NEM compare with the GB electricity market?

FeatureAustralia’s NEMGreat Britain
Market designEnergy-only gross pool run by AEMOBilateral trading through exchanges, then real-time balancing by NESO
Dispatch and settlement intervalFive minutes30 minutes
Locational pricingZonal: one price per region, adjusted by Marginal Loss FactorsNational: one price for the whole country
Capacity paymentsNone; government schemes such as the Capacity Investment Scheme underwrite new buildCapacity Market, with T-4 and T-1 auctions
Frequency services10 FCAS markets, co-optimised with energyDynamic Containment, Moderation and Regulation, Static FFR and Quick Reserve, contracted separately
Behind-the-meter access to wholesale pricesWholesale Demand Response; spot-exposed retail contractsP415 through a Virtual Trading Party

Thinking Energy

NEM energy market videos

Short explainers from the Gridcog team on the NEM and how to model projects in it.

 

Modelling short vs long energy storage systems

April 2026 · 3:40

 

Modelling Fixed Shape-Fixed Volume energy contracts

March 2026 · 3:53

 

Modelling V2G opportunities for long-stay parking in Australia

January 2026 · 4:49

 

Retrofitting a BESS to a standalone solar farm

December 2025 · 4:41

 

Maximising value from existing solar assets with battery storage

August 2025 · 4:46

 

Modelling demand response in the Australian NEM

June 2025 · 4:17

Prices and spreads

Why are NEM price spreads falling?

Because more solar is pushing midday prices down while more batteries are flattening the evening peak. In autumn 2026, average afternoon peak prices in the mainland NEM reached only about $80/MWh and midday troughs fell to about $12/MWh: a year-on-year fall of over 70% in two-hour spreads. Batteries earned over 60% less than in autumn 2025, and over 80% less than in 2021.

Battery participation has grown fast. In the first quarter of 2026, evening peak battery discharge rose by 275% and daytime charging by 300%, and batteries set the price in over 32% of intervals (AEMO). Over 2.5 GWh of new home batteries were installed in the same quarter alone, driven by the federal Cheaper Home Batteries Program; by October 2026 the programme had added over 11 GWh, close to the volume installed at utility scale.

How often are NEM prices negative?

Often, and more each year. Victoria recorded nearly 1,500 hours of negative prices in 2025, about four times as many as five years earlier and equivalent to two full months. That is nearly ten times the UK’s total for 2025. In Victoria and South Australia, over 30% of solar generation in 2024 was sold at negative prices.

Revenue streams

How do batteries and solar farms earn money in the NEM?

From spot arbitrage first, then FCAS, contracts and government schemes. Without very high FCAS prices, a large battery usually earns 50% or more of its wholesale revenue from spot price arbitrage. Solar farms earn spot revenue and Large-scale Generation Certificates (LGCs), and increasingly add storage to avoid selling into negative prices.

FCAS markets are shallow, so new batteries quickly saturate them. Very fast FCAS launched with very high prices that were soon competed away, and the NEM’s new Frequency Performance Payments totalled only $3.6 million across the market in June 2025. In Pete Tickler’s model of the 130 MW Glenrowan solar farm with storage, adding ancillary services lifted revenue by a modest 5%.

  • Wholesale
  • Balancing and frequency
  • Capacity and contracts
  • Behind the meter

Wholesale

Spot arbitrage

Charge in low-price intervals and discharge in high-price ones; the intraday spread is what matters, not the average price

Who it suits

Batteries of any size with spot exposure

Balancing and frequency

Contingency FCAS

Eight markets that hold capacity to respond to sudden frequency changes, from one second to five minutes

Who it suits

Batteries and fast-responding loads, including small aggregated assets

Balancing and frequency

Regulation FCAS

Two markets that follow small, continuous frequency changes every four seconds

Who it suits

Utility-scale front-of-meter assets, typically over 5 MW

Capacity and contracts

Government underwriting

Long-term revenue support through the Capacity Investment Scheme, state schemes such as South Australia’s FERM, and the ESEM from 2027

Who it suits

New generation and storage, especially longer-duration storage

Capacity and contracts

Contracts and certificates

Caps, swaps, tolls and power purchase agreements (PPAs); LGCs for eligible renewable generation

Who it suits

Solar, wind, batteries and hybrids seeking bankable revenue

Behind the meter

Wholesale Demand Response

Large users bid demand reductions into the spot market, independently of their retailer

Who it suits

Large energy users that can meet strict baselining rules

Behind the meter

Network tariff savings

Cut demand and time-of-use network charges set by each distribution network

Who it suits

Behind-the-meter batteries and flexible loads

01 / 07

What are the 10 FCAS markets?

Two regulation markets and eight contingency markets, each with a raise and a lower service. Raise services add power or reduce load when frequency falls below 50 Hz; lower services do the opposite.

FCAS marketRespond fully withinSustain response for
01Regulation raise and lower
Continuous changes every four secondsOngoing
02Very fast raise and lower (1 second)
One secondSix seconds
03Fast raise and lower (6 second)
Six seconds60 seconds
04Slow raise and lower (60 second)
60 secondsUp to five minutes
05Delayed raise and lower (5 minute)
Five minutesUp to 10 minutes, or until frequency recovers above 49.9 Hz

CIS and ESEM

What replaces the Capacity Investment Scheme?

The Electricity Services Entry Mechanism (ESEM). The ESEM will be the NEM’s enduring government support mechanism for new generation and storage, replacing the Capacity Investment Scheme (CIS) as it winds down in 2027. Pilot ESEM tenders could start in early 2027, with the first full tender expected in late 2027. It came out of the NEM wholesale market settings review led by Tim Nelson, whose final report was published in December 2025.

SchemeWhat it doesStatus (November 2026)
01Capacity Investment Scheme (CIS)
Federal revenue support for new renewable generation and clean dispatchable capacity, through competitive tenders; target raised to 40 GW by 2030 in July 2025Tenders running; scheme ends in 2027
02Electricity Services Entry Mechanism (ESEM)
Warehouses three tradeable contracts (shaping, bulk energy and firming) bought by reverse auction from projects at least three years after commercial operationPilot tenders from early 2027; first tender expected late 2027
03South Australia’s Firm Energy Reliability Mechanism (FERM)
Supports dispatchable projects of at least 30 MW that can run at full output for eight hours, with obligations during Lack of Reserve eventsFirst round targets 700 MW, with 400 MW by late 2028

What are the ESEM’s three contracts?

Catalina VillaroSenior Energy Analyst

In Gridcog, Catalina Villaro modelled the same Regional Reference PPA for two identical solar farms in North and South Queensland. Cashflows differed significantly, because the strike settles against the state reference fleet’s capture price, not each farm’s own output.

ESEM serviceContractHow it settles
01Shaping
Time of Day Block Spread Swap: a top/bottom spread contract with charge and discharge windows set the day before from AEMO’s residual demand forecastWeekly, against spot prices inside the pre-agreed windows
02Bulk energy
Regional Reference PPA: volume tied to a Reference Production Index for every wind or solar asset over 30 MW in the regionNotional volume × (strike price − spot)
03Firming
A standard cap struck at $600/MWh, in line with the Administered Price CapSeller pays out whenever spot clears above $600/MWh

Curtailment and MLFs

How much NEM solar is curtailed, and why does location matter?

More every year, and for different reasons by region. Across about 40 mainland solar farms operating since 2020, South Australia now loses 42% of available generation, almost all of it economic curtailment driven by negative prices. New South Wales has seen the sharpest rise, with total curtailment up sixfold since 2020 and about 11% lost to network constraints. Every asset with more than 5% network curtailment is in NSW or Victoria.

That makes network studies as important as price forecasts. Assuming a flat export limit, rather than modelling dynamic network constraints, can significantly overstate a project’s revenue, particularly in NSW and Victoria.

What is a Marginal Loss Factor?

A multiplier that adjusts a site’s energy for the electrical losses between it and its region’s reference node. AEMO sets Marginal Loss Factors (MLFs) every year for every connection point, and they apply to both dispatch and settlement. The revenue difference between a site with an MLF of 0.81 and one of 1.09 can be up to 30% a year, and MLFs can change every year.

Does adding a battery to a NEM solar farm pay?

In the cases we have modelled, yes. Over 20 years on merchant prices, a 110 MWdc standalone solar farm in North-Western Victoria ended up about $13 million in the red, while the same farm with a 50 MW / 4-hour battery delivered about $42 million in profit, even after an extra $100 million in hardware. Across five operating NEM solar farms, a 50 MW / 2-hour battery could have raised revenue by 100% to 400% under perfect conditions.

Modelled in Gridcog

What happens when you retrofit a battery to a curtailed solar farm?

It can capture much of the energy the farm was throwing away. Gridcog Senior Energy Analyst Scott Bosman used a live feed of five-minute data from the 110 MW Wemen Solar Farm in Victoria and modelled it on pure merchant prices over 12 months.

This is a best-case revenue model: MLFs, grid constraints and forecast uncertainty weren’t applied. Gridcog’s autosizing can include them when sizing a real project.

Scott BosmanSenior Energy Analyst

StepWemen Solar Farm, Victoria, last 12 months (modelled March 2026)
01Curtailment
Only 76% of available generation was sent out; about 50 GWh was curtailed for economic or network reasons
02Exporting everything
Would have earned $700k less, despite exporting 1.3 times more volume, because so much would have sold at negative prices
03Autosizing
Gridcog’s autosizing found an optimal 4-hour battery of about 163 MW, using CSIRO GenCost prices and $500k per MW for grid import augmentation
04Result
21 GWh, or 23% of solar exports, went straight to the battery to be sold later at non-negative prices

Sizing a battery for a NEM solar farm or testing its revenue stack?

Model your project in Gridcog

Large energy users

How can large energy users take part in the NEM?

Through Wholesale Demand Response, spot-exposed contracts and their own generation and storage. Wholesale Demand Response, introduced in October 2021, lets large users bid demand reductions into the spot market independently of their retailer, but strict baselining rules have slowed uptake: only 74 MW was registered as of May 2025.

Large data centres face new obligations. On 15 July 2026 the Prime Minister announced a national framework requiring large data centres to pay the full cost of their grid connection and be ‘net-generators, not net-users’. The AEMC’s advice to energy ministers proposes certificate and firming obligations that behind-the-meter generation, storage and flexibility would reduce, so every on-site MW lowers what a site must buy for the life of the asset.

How Gridcog models the NEM

How does Gridcog model the National Electricity Market?

With the NEM’s own prices, rules and tariffs, in five-minute intervals. Regional spot and FCAS prices come from AEMO’s NEMWeb and update daily in the Gridcog Library. Gridcog co-optimises energy and FCAS dispatch, so a battery’s revenue stack reflects the trade-offs between markets.

Historical regional spot prices for every NEM region, plus your own forward curves or premium price scenarios. With Market Price Forecast Uncertainty, a battery dispatches on a forecast and settles on actual prices.

All 10 FCAS markets, with history back to 2010, and settings for offers accepted, headroom and footroom, bid rounding and energy utilisation, so ancillary revenue reflects shallow markets.

Apply an MLF or transmission loss factor to a site or submeter, set import and export limits, and model dynamic network constraints rather than a flat export limit.

Feeds collects five-minute performance data for operating assets from the system operator, so you can model a real solar farm or battery against what it actually did.

Network tariffs for every network owner in the NEM and WEM for the current regulatory year, and forward LGC prices from the Mercari Forward Price Index.

Size batteries by power and duration, or let autosizing find the combination of solar, wind and storage with the highest net cashflow, including augmentation costs.

Model caps, swaps, tolls, PPAs and floors like those in the CIS, FERM and ESEM, add each stakeholder, and compare cashflows, IRR and NPV in the Investment Case Report.

Customers

Which Australian teams use Gridcog?

Independent power producers, commercial and industrial developers and e-mobility businesses use Gridcog to model projects in the NEM. Three have published how.

All case studies
  • Photon Energy Australia

    Solar developer, operator and independent power producer

    Uses Gridcog to model capital and operating costs, tariff rates and solar irradiance against project profitability.

    ‘The software allows us to quickly turn around complex financial models, which is invaluable in a market that’s as dynamic and competitive as this one.’
    Ugur Uzer, Project Manager/Engineer
  • Volta Energy Group

    Renewable energy advisory, delivery and operations, Melbourne

    Models projects across South Australia, Victoria, New South Wales, Queensland and the Northern Territory.

    ‘On a typical C&I project, Gridcog saves us at least two days.’
    Ryan McKenzie, Founder and Managing Director
  • NewVolt

    Shared charging hubs for electric trucks, Melbourne

    Sized three 2–4 MW charging hubs, with battery storage and on-site renewables, for the Melbourne Electrified Freight Network.

    ‘Gridcog could integrate infrastructure planning with commercial scenarios.’
    Rainer Knobloch, Co-Founder and COO

Experts

Who are Gridcog’s NEM market experts?

Gridcog was founded in Australia, and its team there writes most of the analysis this page draws on.

  • Fabian Le Gay Brereton

    CEO and Co-Founder

    Co-founded Greensense, which was acquired by ERM Power (now Shell Energy), before co-founding Gridcog.

  • Pete Tickler

    Chief Product Officer and Co-Founder

    Author of Gridcog’s analyses of Marginal Loss Factors, longer-duration batteries and adding storage to NEM solar farms.

  • Scott Bosman

    Senior Energy Analyst

    Works with Gridcog’s customers in Australia on how they model their projects. Before Gridcog, he was an Energy Transition consultant at PwC, where he used Gridcog to model solar and battery scenarios for a client.

  • Catalina Villaro

    Senior Energy Analyst

    Author of Gridcog’s guides to ESEM contracts and battery offtake, and of work on local solar sharing in Australia.

Frequently asked questions

No. The NEM covers Queensland, New South Wales (including the ACT), Victoria, South Australia and Tasmania. Western Australia’s main grid, the South West Interconnected System, runs its own Wholesale Electricity Market (WEM), which pays for capacity as well as energy. The Northern Territory is also outside the NEM. See Western Australia’s Wholesale Electricity Market.

No. The NEM is energy-only, so generators and storage are paid for the energy and FCAS they provide, not for being available. Investment signals come from wholesale prices, supported by government schemes such as the Capacity Investment Scheme and, from 2027, the Electricity Services Entry Mechanism. Western Australia’s WEM does have a capacity mechanism, the Reserve Capacity Mechanism.

The market price cap is $23,200/MWh for 2026–27, up from $20,300/MWh in 2025–26, and the market floor price is −$1,000/MWh. If prices stay high for long enough to breach the cumulative price threshold of $2,225,900/MWh, AEMO applies the Administered Price Cap of $600/MWh. The AEMC reviews these settings regularly.

The NEM wholesale market settings review, led by an expert panel chaired by Tim Nelson. Its final report, published on 16 December 2025, kept the energy-only market and recommended the Electricity Services Entry Mechanism (ESEM) as the long-term support mechanism for new generation and storage once the Capacity Investment Scheme ends in 2027. Energy ministers agreed in principle, except Queensland.

A mechanism, live since October 2021, that lets large energy users in the NEM, or their Demand Response Service Providers, bid demand reductions into the wholesale market independently of their retailer. Sites must meet strict baselining requirements so that reductions are measurable. Uptake has been slow: 74 MW was registered as of May 2025. Read our guide.

Increasingly. In early 2025, every operational utility-scale battery in the NEM was one to two hours, because intraday spreads fell steeply beyond two hours. In Pete Tickler’s February 2025 model of 100 MW batteries in NSW, long periods of low prices followed by high prices sustained spreads for four and eight hours, sometimes 12. See long duration energy storage (LDES).

Yes, all 10 of them. Gridcog co-optimises a battery’s energy and FCAS dispatch with realistic settings for capacity registered, offers accepted, headroom and footroom, bid rounding and energy utilisation. That matters because FCAS markets are shallow: in Queensland, a simplistic forecast overstated FCAS revenue 9.5 times for a utility-scale battery compared with a realistic Gridcog model.

We benchmark it against real batteries every year and publish the results to customers. In Scott Bosman’s 2024 benchmarking, the modelled Queensland battery came within 2.9% of the real battery’s annual revenue, even though it cleared less FCAS volume during October’s high-price events. Compare your project with our benchmark projects.

Queensland vs Victoria: which state delivered better battery revenues in 2024?

Request a live demo

Model your NEM project in Gridcog

Request a demo and we’ll show you how Gridcog models your project against NEM spot prices, FCAS, loss factors and network tariffs.

The team behind Gridcog

Fabian Le Gay Brereton, Chief Executive Officer and Co-Founder of Gridcog

Fabian Le Gay Brereton

Chief Executive Officer & Co-Founder

Previously co-founded Greensense, acquired by ERM Power (now Shell Energy).

Pete Tickler, Chief Product Officer and Co-Founder of Gridcog

Pete Tickler

Chief Product Officer & Co-Founder

Co-founded Greensense and led digital innovation at ERM Power (now Shell Energy).

Genna Boyle, Chief Commercial Officer and Head of EMEA at Gridcog

Genna Boyle

Chief Commercial Officer & Head of EMEA

More than 10 years in energy strategy, trading and renewables, with senior roles at Battery Optimiser and Limejump.

Which other markets does Gridcog model?

Gridcog supports 40+ markets, including Western Australia’s WEM, New Zealand, Great Britain and, in Europe, Ireland, Germany, Spain, Poland, Italy, Portugal, the Netherlands, Belgium and France.

All markets